About

GivePulse Stats

Groups

  • Trails and Open Space

  • The Athens-Clarke County Leisure Services Department

  • Athens-Clarke County Unified Government

  • Middle Oconee Parks

  • Impacts

    Trails and Open Space

    I walked the Greenway from Sandy Creek Nature Center down to North Avenue and also checked the connector trails that run to MLK and the rainbow forest for trash. It was really hot/humid even in the morning, but there were still several people walking and biking on the trail.

    I picked up about 2 grocery bags of trash along the way. The worst area was probably around the culvert between the 2 connector trails just down from Ruth Dr and MLK. There's a social trail through the culvert that has a lot of trash and might be a homeless camp. I didn't go down there to clear any of the trash but it probably needs to be done at some point.

    Gave 1.50 hours on 07/12/2024 with Athens-Clarke County Unified Government
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Mark,
    Thanks for that feed back regarding the culvert. I'll go and check it out, maybe it'll be a good spot for Rivers Alive!
    Christine
    Saturday Trail Work
    Trails and Open Space

    I hiked Lakeside trail starting at the beach parking lot. The weather was nice and temperatures weren't too bad - even a nice breeze at times. I saw several other people out on the trail.

    Along the way, I picked up about half a grocery bag of trash with most of that coming from the trail near the boat ramp and fishing spots along that side.

    As a future trail work suggestion, several sections along the trail between the boat ramp and Jordan bridge needs some recut similar to what trail team has been doing at Memorial Park the last couple months. The back slope has eroded onto the trail and it's pushing people towards the downhill edge, also creating fairly steep angles on the trail surface where it should be flat.

    Additionally, the west side of the trail has several areas of vegetation encroachment especially up near the Jordan bridge.

    Gave 2.75 hours on 06/18/2024 with Athens-Clarke County Unified Government
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Mark,
    Thanks for the feedback on the trial maintenance! I'll make a note of that of the back slope for a future workday! I'll have staff address the vegetation on the west side of the bridge. Thanks Mark!
    Trails and Open Space

    I walked across the east campus bridge and up the east campus connector to Waffle House. I forgot the Lexington Hwy trailhead was closed for construction, but I managed to make my way across to the Firefly trail. I followed Firefly down to the ramp at Peter St, then followed Poplar across Oak St and took the Greenway down through the Cemetery back to east campus.

    Even though the temperatures were pretty mild for this time of year (mid 80s) and there was a nice breeze, there weren't a lot of people out on the trail.

    I picked up about 1 grocery bag of trash.

    Gave 1.25 hours on 06/09/2024 with Athens-Clarke County Unified Government
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Mark,
    Thanks for the report! During the summer our trail counter data decreases, the students really enjoy using The Greenway for leisure as well as transportation and the numbers reflect that. I also think a lot of folks are on family vacations right now. I personally have been enjoying the reduced traffic and some nice peaceful rides along The Greenway. Have a great day Mark!
    Trails and Open Space

    I hiked Cook's Trail and Oxbow Loop. It was hot and humid but there was a nice breeze. I did pick up a few items of trash, but the trail was fairly clean. The trail reroute around that fallen tree looks good. You already know about the tree down by the double bridge, so I'm not reporting that. I'm glad the trail was in good enough shape that I could finally do the whole trail again!

    I encountered someone with a dog off-leash and let him know county ordinance requires dogs to be leashed at all times. I saw him again on the way back up to Sandy Creek Park and the dog was on a leash that time.

    I've attached some photos of maintenance issues.
    1) There is a dead tree on the edge of the trail with bark falling off that probably needs to be cut before it falls on its own.
    2) The double bridge needs some repairs. There are a couple boards that have worked loose and are sticking up.
    3) Towards the beginning of Oxbow Loop, there is some vegetation encroachment.
    4) There is a small tree across the Oxbow Loop that is a trip hazard.
    5) I think I reported this before, but part of the long boardwalk on Oxbow Loop has a bunch of boards that are broken/rotted/missing. It was marked with orange tape and I added red tape on it to alert other trail ambassadors it had already been reported.
    6) Coming from Oxbow Loop back up Cook's Trail, there is a thick muscadine vine across the trail that is a trip hazard. It got taken down when a tree fell across Sandy Creek.

    Gave 2.00 hours on 06/06/2024 with Athens-Clarke County Unified Government
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Good eye Mark! The boardwalk on Ox-bow is something I want to remove. We know about the bridge boards, however, our maintenance staff is down a position and they are busy with swimming pools. I did spray the corridor this week so the grass growing in the trail should get better soon. Thanks for your report. Cooks is one of the least used, yet hardest to maintain trails we have. I can get wild and wooly out there.

    This Impact is private

    This Impact is private

    Saturday Trail Work

    Gave 1.50 hours on 05/25/2024
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Great job today Mark. I have enjoyed this project!
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Everyone including myself has enjoyed this project. I think we will have one or two more sessions out there. The work looks fantastic! Re-cuts seem like a good fit for summer trail work. We can start and stop without impacting trail use. It is tough to commit to a big project in the heat and humidity.
    Trails and Open Space

    I walked the Greenway from East Campus connector bridge to the Bailey St trailhead, then back to the Carriage Ln trailhead, going down Carriage Ln to the Carrs Creek trailhead and back to East Campus connector.

    The weather was a bit warm, but there were quite a few people using the trail including a large bicycle group ride. I encountered a ratsnake on the trail behind the Woodlands near the Bailey St trailhead and stopped to take a picture. It was gone when I came back the other direction. And I picked up about 2 grocery bags of trash.

    Gave 1.33 hours on 05/21/2024 with Athens-Clarke County Unified Government
    GivePulse profile picture of Trails and Open Space Trails and Open Space  2 years ago
    Great work Mark. See you Saturday!
    Saturday Trail Work